Eastern City (5)

Engine room under construction.

Purifier module ready to be lifted aboard

 
The ship is ballasted down by the head so the stern tube is clear of the water. The propellor shaft was only pulled in far enough for the propeller to be removed.
 

The photo top left shows the purifier module on the quayside ready to be lifted aboard.

The photo top right shows the unit being lifted aboard and from this you can see that all the pipework etc is complete so there is the minimum of work to do when it is installed in the engine room. The larger photo shows more detail.

The photo on the right shows the module in it's final position in the engine room.

 
     
Holding down bolts   Main engine side chocks
Close up of main engine holding down bolt arrangement and side chocks.
     

Cable layout under the floor plates in the engine control room.

  Cables under floor plates
     
Inside diesel oil settling tank showing outlet pipes from diesel service tank passing through tank.   Pipes in diesel oil settling tank
     

Intermediate shaft bearing installed in place.

The protective covering was left on the shafts until the area had been painted.

All photos copyright © Reardon Smith Ships.

  Intermediate shaft bearing
 