Installation of the three alternator sets |
||
The red structure has now been put in place, and there is a similar one on the port side. It will be noted that the main engine starting bottles are in place and these were added as the section was fabricated. The alternator sets were lifted into position before the side structures were put in place. |
||
These photos show a close up of the B&W alternator engines. They are just lifted into place at this time and will be lined up later at the fitting out dock. |
||
These photos show the NEBB alternators with filters. All photos copyright © Reardon Smith Ships. |
||