Eastern City (5)

Installation of the three alternator sets

Aft section with alternators

  Close up of alternators
  The red structure has now been put in place, and there is a similar one on the port side. It will be noted that the main engine starting bottles are in place and these were added as the section was fabricated.
The alternator sets were lifted into position before the side structures were put in place.
 
Close up of top of alternators  

These photos show a close up of the B&W alternator engines.

They are just lifted into place at this time and will be lined up later at the fitting out dock.

 
     

Close up of alternator

  View of NEBB alternator
 

These photos show the NEBB alternators with filters.